This page explains how a China CNC processing quote is built, what our engineers check before pricing, and when an online quote is enough to release a job. It is written for design engineers and sourcing teams who need a price they can act on, not a sales reply.

Quote and DFM in 12 hours±0.005 mmNo MOQNDA on request
China CNC Processing: Fast Online Quotation
Overview

What a Fast Quote Actually Requires

A price is only useful if it survives contact with the shop floor. Here is what we need to give you one.

Quote inputs

What We Need Before We Can Price Your Part

An online quotation system is fast because it asks for the same few things our estimators ask for. A 3D model in STEP or IGES format, a 2D drawing if the part has tolerances or threads that are not modeled, the material grade, the quantity, and the surface finish. Send those five items and the quote is arithmetic plus process planning, not guesswork.

Files matter more than words. A STEP file with no drawing forces us to assume general tolerances, which are looser than most engineers expect. Suppose a bore needs ±0.005 mm or a face needs Ra 0.8–1.6 μm. That belongs on a drawing. One extra sheet of paper often changes the price more than a change of supplier does.

Quantity drives the process choice. One bracket is milled from bar stock or plate on a three-axis machine. Two thousand brackets may move to a dedicated fixture, a four-axis tombstone, or die casting. Tell us the annual volume as well as the first order, because the right process for 50 pieces is rarely the right one for 5,000.

If your part is under NDA, upload it anyway. Files are stored on access-controlled servers, and we can sign your NDA or return ours before any drawing is opened. Nothing about a fast quote requires you to expose design intent you would rather keep internal.

DFM feedback

The DFM Check That Comes With the Price

Every quote from our Dongguan plant includes a free DFM analysis, returned with the price inside 12 hours. It is a short list, not a redesign: wall thickness that will chatter, a pocket too deep for the tool diameter, a thread that needs a specific tap drill, a tolerance that cannot be held on the quoted setup.

Most flags are about tool access. A 0.8 mm deep slot with a 0.4 mm corner radius needs a 0.8 mm cutter, which will deflect unless we slow down and take light passes. We will quote it either way, but the note tells you the cost of that corner. Change it to 1.5 mm and the price often drops by a visible margin.

Tolerance stacking is the second common flag. A stack of five ±0.05 mm features can land outside ±0.005 mm overall. We point out where to control the datum and where the tolerance is free. That conversation usually happens before the first chip, which is cheaper for both sides.

We flag the process too. A part with deep bores and a turned outside face may run better on a mill-turn center than as two operations. That is not a sales line; it is the difference between two setups and one, and it shows up in the quoted hours.

Capability

Process Parameters You Can Quote Against

Numbers below are the limits we hold on production work, not best-case laboratory results.

ItemCapabilityNotes
General tolerance±0.005 mm±0.0002 in, on controlled features
Fine finishRa 0.2–0.8 μmPolishing or fine boring
Standard finishRa 0.8–1.6 μmTypical machined seal face
As-machinedRa 1.6–3.2 μmNon-critical surfaces
Max part size4,000 mmLongest single dimension
Large travel4,000 × 400 × 150 mmLong, shallow parts
Medium travel750 × 1,150 × 550 mmMost fixtures and housings
Compact travel500 × 500 × 450 mmSmall precision work
Rotary tableØ400 mmFour-axis indexing
Qualification rate99.99%First-pass accepted parts
Inspection100% before shipmentReports on request
Materials

Material Choice Changes the Setup, Not Just the Price

Aluminium is the default for prototypes and light production. Grades 6061 and 6061-T6 machine cleanly at high spindle speeds and hold tight tolerances without stress relief. Grade 7075 is stronger but gummier; it needs sharper tools and a slower feed, and thin walls will move after machining. For housings, 6082 and 6063 give better anodizing results than 7075.

Stainless is where quotes spread out. Grade 303 cuts freely and suits high-volume turned parts. Grade 304 and 316 work-harden, so a light finishing pass that rubs instead of cuts will raise the price fast. Grade 17-4PH (SUS630) is common in aerospace and medical work; it machines well in the annealed state and gains strength after heat treatment, which we schedule as a separate step.

Titanium and nickel alloys run at low surface speeds. TC4 (Ti-6Al-4V) needs rigid setups and generous coolant, and a part that takes 20 minutes in aluminium may take two hours. Inconel is slower again. We quote these as their own line item so you can see the real cost before committing.

Plastics behave differently. POM and PEEK hold tolerance well; ABS and PP deflect under clamping pressure, so we use soft jaws and light cuts. Carbon fibre needs diamond-coated tooling and dust control. Tell us the service temperature and whether the part will be sterilized, because that decides between PEEK, POM and PC.

Timing

Where the Speed Comes From

A quotation and free DFM analysis come back within 12 hours. That is a full working shift for an estimator to open the model, pick a process, and check tooling against our machine list. It is not an automated number from a formula.

Production can start within 24 hours of a released order. Raw material is the usual constraint: 6061 plate and 303 bar sit in stock, while a specific titanium grade or a large 7075 block may need a day to arrive. Parts ship in 3–5 days for standard jobs. Historical late-delivery probability at our plants is below 2%.

Three wholly-owned plants and 127 high-precision CNC machines, including 16 simultaneous 5-axis machining centers, mean a job does not wait for a machine to free up. When a five-axis center is busy, a quote can move to a mill-turn center without changing the drawing or the inspection plan.

Complex geometry is where five-axis earns its place. Adding rotation around the part lets a single setup reach undercuts, compound angles and deep pockets that would need three or four fixturings on a three-axis machine. Each refixturing adds setup time and a new chance for position error.

FAQs

Questions Engineers Ask After the Quote

How accurate is an online quote compared with a final invoice?

The quoted price holds as long as the drawing, material, quantity and finish do not change. If the DFM note suggests a change and you accept it, we reissue the price before cutting metal.

The two things that move a price after release are added inspection requirements and a material substitution you request mid-run.

What file formats do you accept?

STEP and IGES for 3D geometry, DXF for sheet metal flat patterns, and PDF or DWG for 2D drawings. Native SolidWorks and Inventor files also open on our side.

Send the drawing even when the model looks complete. Threads, chamfer callouts and surface finish notes usually live only on the drawing.

Can you hold ±0.005 mm on every feature?

No, and no shop should claim that. ±0.005 mm is applied to the features you mark as critical, measured with the right instrument at the right temperature.

General features run to standard tolerances. Marking every dimension as critical raises cost without improving function.

Do you machine one-off parts?

Yes. There is no minimum order quantity. We run single prototypes up to 10,000+ part production, and the setup is planned the same way in both cases.

For a one-off, expect the quote to be dominated by programming and setup hours rather than material.

How are my files protected?

Uploads are stored on access-controlled systems, and the plant operates under ISO 27001:2022 for information security. An NDA is available on request, and we will sign yours.

Only the estimator and the machining team assigned to your job see the model.

What certifications cover the work?

The Dongguan operation holds ISO 9001:2015, IATF 16949:2016, ISO 13485:2016 and ISO 27001:2022. Automotive and medical programs are quoted with the inspection records those standards require.

Raw material certificates come with the batch, and inspection reports are available on request.

Send the Model, Get a Price You Can Plan Around

Upload a STEP file and a drawing, and an estimator returns a quotation with DFM notes within 12 hours.

12-hour quote100% inspectionNDA on request