Tolerance and inspection
Tight tolerance is a process, not a claim
Holding ±0.005 mm on a production run means controlling temperature, tool wear, and fixture rigidity. On aluminium and stainless parts, we rough, semi-finish, and finish as separate passes so the material settles before the final cut. In-process probing catches drift before a batch is finished, not after.
Inspection is not a final gate alone. Raw material certificates are checked on arrival. Dimensions are monitored during the run. Every part is inspected before shipment, and inspection reports come on request. That sequence is what keeps a qualified shop at 99.99% qualification rate across steel, aluminium, stainless, and engineering plastics.
- 1
Ra 0.2–0.8 μmFine finish for sealing faces and bearing bores
- 2
Ra 1.6–3.2 μmStandard as-machined finish for non-critical surfaces
- 3
100% inspection before shipmentReports available for your quality file