GreatLight CNC Machining Factory logo
CNC Machining
Rapid Prototyping
Materials
Industries
News
About GL

Get Instant Quote

Buyer guide

How to Choose a CNC Processing Company

This guide is for engineers and sourcing leads who need to pick a CNC processing company without a plant visit. It covers the checks that actually separate suppliers: machine envelope, tolerance capability, quoting discipline, certification coverage, and what happens when a part fails inspection.

±0.005 mm toleranceNo MOQQuote in 12 hoursISO 9001 / IATF 16949
CNC processing company machining a precision part
Quick answers

Key takeaways

Tolerance claims need a machine behind them±0.005 mm is a process capability, not a marketing line. Ask which machine holds it and on what part size.
Certification must match your industryISO 9001 is the floor. Automotive needs IATF 16949; medical needs ISO 13485.
No MOQ changes prototype mathA supplier that runs one piece and a 10,000-piece lot on the same floor removes tooling risk from early builds.
Quote speed predicts production speedA shop that returns a DFM report with the quote has already read your model.
Inspection reports are not optionalAsk what is measured, on which instrument, and whether the data ships with the parts.
Selection matrix

What to check against what you are buying

Use the left column to decide how much of the right column you need to verify.

Your situationCritical checkWhy it decides the award
Prototype, 1-50 partsNo MOQ + 3-5 day shippingTooling deposit kills small-batch economics
Production run, 1,000+ partsCapacity and machine countA 30-machine shop absorbs demand spikes
Automotive or EV partIATF 16949:2016Without it, your customer audit blocks the line
Medical device componentISO 13485:2016 + material traceabilityDesign history file needs documented process control
Aerospace bracket or housing5-axis capability, 16 centers or moreUndercuts and compound angles need simultaneous motion
Large frame, over 1,000 mm4,000 mm max processing sizeOversize parts get split and re-fixtured, adding error
Cosmetic visible surfaceFinishing in-houseOutsourced anodizing adds days and handling damage
Confidential new productNDA available + ISO 27001:2022Design files are the asset you are shipping

The short version

Pick the supplier whose machine envelope, certification set and inspection plan match your part, not the one with the longest service list. Three checks decide most awards: can they hold the tolerance at your part size, do they have the certificate your customer audits, and will they run one piece before ten thousand.

Capability

Start with the machine envelope, not the brochure

Every CNC processing company publishes a tolerance number. Very few publish the part size that number applies to. A shop holding ±0.005 mm on a 50 mm aluminum bracket is doing something different from a shop holding it on a 900 mm steel plate. Thermal drift and fixture stiffness scale with size, so the tolerance claim has to arrive with a work envelope.

Ask for the travel dimensions of the machines that would run your part. At GreatLight the largest travel is 4,000 × 400 × 150 mm, with medium platforms at 750 × 1,150 × 550 mm and 600 × 600 × 600 mm, and compact cells at 500 × 500 × 450 mm and 500 × 310 × 200 mm. If your part sits near the edge of a travel limit, expect the shop to quote a larger machine, which changes the hourly rate.

Count the spindles, not the brand names. A supplier with 127 high-precision CNC machines can move a hot job to another cell when a spindle goes down. A supplier with six machines cannot. This matters most in the two weeks before your build, when a single tool break can push a delivery date.

Five-axis capacity deserves a separate question. Sixteen simultaneous 5-axis machining centers is enough to run compound-angle work without re-fixturing. If a supplier only offers 3-axis plus a tilting vise, your part will be set up three or four times. Each setup adds position error and labor.

  • 1
    Get travel numbers in writingX, Y and Z for the specific machine class, not the shop maximum.
  • 2
    Match axis count to geometryUndercuts, deep pockets and compound holes justify 5-axis.
  • 3
    Check the rotary table sizeA Ø400 mm table limits what can be turned in one chucking.
Speed

Lead time is a process, so read the process

A quoted lead time of five days means nothing unless you know where the days go. Ask the supplier to break it down: quoting, material purchase, machining, finishing, inspection, packing. A shop that stocks common alloys starts machining sooner. One that orders 7075 plate per job adds purchase lead time before the spindle ever turns.

The first milestone is the quote itself. A quotation and free DFM analysis within 12 hours tells you the shop has an engineer reading models, not a salesperson forwarding PDFs. The DFM notes are the useful part. If the report flags a 0.5 mm floor radius that needs a 3 mm cutter, you have a chance to fix the model before the first chip.

Production start within 24 hours is achievable when the material is on the shelf and the fixture design is simple. If your part needs a custom soft jaw or a vacuum plate, add design and cut time. Do not treat the 24-hour figure as a promise on every geometry.

Shipping in 3-5 days covers standard metals and finishes. Anodizing in a custom color, hardcoat, or electroless nickel can add a day or two depending on rack loading. Ask which finishes are run in-house. In-house tumbling and bead blasting remove a truck trip and the handling damage that comes with it.

  • 1
    Split the lead timeMaterial, machining, finishing, inspection. Ask for each.
  • 2
    Read the DFM reportIt shows whether an engineer touched your model.
  • 3
    Confirm finish locationIn-house plating and anodizing cut days and damage risk.
Risk

Certifications and quality control you can audit

Certificates are a filter, not a score. ISO 9001:2015 covers process discipline and is the baseline for any serious supplier. IATF 16949:2016 is the automotive requirement and implies tighter change control and traceability. ISO 13485:2016 applies to medical device work and expects documented process validation. ISO 27001:2022 covers information security, which matters when you send CAD files to a factory on another continent.

Match the certificate to the part, not to the company size. A shop with all four certificates still has to assign your job to a qualified cell. Ask who signs the inspection report and what instrument produced the numbers. Calipers are fine for a bracket. A CMM is needed for true position on a housing with six mating holes.

Inspection coverage is where quotes diverge. A 100% inspection before shipment means every part is measured, not sampled. That includes raw material check, in-process monitoring and final inspection. Reports go out on request, so specify the format you need: a first article report, a dimensional layout, or a simple pass/fail sheet.

A qualification rate of 99.99% is only meaningful if the supplier defines what counts as a defect. Ask whether cosmetic scratches on a non-cosmetic surface are counted, and how parts are handled after inspection. A clean measurement in a dirty bin still arrives as a rejected part.

  • 1
    Ask for the scope, not the logoWhich process and which plant does the certificate cover?
  • 2
    Specify the measurement methodMatch the instrument to the tightest tolerance on the drawing.
  • 3
    Define a defect up frontCosmetic vs functional criteria should be agreed in writing.
Cost

MOQ, quoting and the traps that inflate price

Minimum order quantity is the fastest way to compare two suppliers. A shop with no minimum order quantity will run one prototype and a 10,000+ part run on the same floor. A shop with a 500-piece minimum forces you to buy inventory before the design is frozen. That inventory becomes scrap when the revision changes.

Quoting method also matters. Some suppliers quote per part plus a setup charge; others fold setup into a higher unit price. Ask for both lines so you can see how the price moves at 10 pieces, 100 pieces and 1,000 pieces. A quote that does not break out material, machining and finishing hides where the cost sits.

Watch for these traps. First, a tolerance on the drawing tighter than the function requires, which forces a second operation and a slower feed. Second, a surface finish specified as Ra 0.2-0.8 μm on a non-sealing face, which adds polishing time. Third, a material listed as "aluminum" without a grade, which lets the shop substitute 6061 for 7075 and change the part's strength.

The reverse trap is under-specifying. A drawing with no datum scheme, no general tolerance block and no finish callout leaves the shop to guess. Guessing is free at quote time and expensive at inspection. One page of clear GD&T prevents most disputes.

  • 1
    Ask for a price ladderUnit price at 10, 100 and 1,000 pieces shows the setup share.
  • 2
    Name the alloy grade6061, 7075 and 2024 behave differently under load.
  • 3
    Do not over-toleranceEvery extra decimal place adds cost without adding function.
  • 4
    Lock the datum schemeA clear GD&T frame removes inspection ambiguity.
Fit

Materials, finishes and industries: where suppliers specialize

Most CNC processing companies can cut aluminum. Fewer handle titanium and nickel alloys without burning tools. TC4 (Ti-6Al-4V) and Inconel require lower surface speeds, more coolant and a rigid setup. If your part is titanium, ask how many hours the shop logged on that alloy last quarter. A vague answer is a warning.

Finish capability follows the same pattern. Anodizing in clear, color, hardcoat and conductive variants is standard for aluminum. Electroless nickel, zinc, silver and gold plating appear on electronics and medical parts. Powder coating and black oxide suit steel frames and brackets. Laser marking needs a minimum character height of 1.5 mm to stay legible after plating.

Industry focus changes the paperwork as much as the machining. Aerospace buyers want material certs and full traceability. Automotive and EV buyers want PPAP-style documentation and IATF discipline. Medical device buyers want process validation records. Robotics and industrial machinery buyers usually care about repeatability across a long run more than paperwork volume.

The practical question is not which industries a supplier lists. It is which industries the shop ran last month. Ask for the share of revenue from your sector. A supplier with 40% automotive revenue will have the fixtures and gauges your part needs. One with 5% will learn on your job.

  • 1
    Ask about alloy hoursTitanium and Inconel demand different speeds and tooling.
  • 2
    Check finish varietyAnodizing, plating, powder coat and laser marking in one flow.
  • 3
    Match sector experienceRevenue share by industry predicts how fast the job runs.
Evaluation

Step by step: qualifying a CNC processing company

Run these steps in order. Each one can eliminate a supplier before you spend engineering time.

  • 1
    Send the model and ask for DFM notesInclude the 3D file, the 2D drawing and a target quantity. A supplier that returns only a price has skipped the review. You want at least three manufacturability comments back with the quote.
  • 2
    Ask for the machine that will run the partRequest travel dimensions and axis count. If the part needs compound angles, confirm simultaneous 5-axis rather than 3+2 indexing.
  • 3
    Request the inspection planAsk which features are measured, on which instrument, and at what frequency. Confirm 100% inspection before shipment if the part is functional.
  • 4
    Verify certifications against your industryISO 9001:2015 minimum. Add IATF 16949:2016 for automotive, ISO 13485:2016 for medical, ISO 27001:2022 if the design is sensitive.
  • 5
    Confirm lead time in stagesGet quoting, material, machining, finishing and shipping separately. Compare against the 12-hour quote and 3-5 day shipping baseline.
  • 6
    Test with a small order firstRun one to five parts before releasing a 1,000-piece purchase order. Check dimensions, finish and packaging, not just the part.
  • 7
    Agree the NDA and file handlingSign the NDA before sending production models. Confirm who can access the files and how long they are retained.
FAQs

Questions buyers ask before awarding a job

How do I compare quotes from two CNC processing companies?

Normalize the scope first. Confirm both quotes cover the same material grade, the same finish, the same inspection level and the same quantity. A lower price often drops the finish or the inspection report.

Then ask for a price ladder at 10, 100 and 1,000 pieces. The slope shows how much of the quote is setup and how much is cycle time.

Is ±0.005 mm realistic on a large part?

It depends on the machine and the material. Holding ±0.005 mm on a small aluminum part is routine. Holding it on a 900 mm steel plate requires temperature control and a stiff setup, and the shop may quote a slower cycle to get there.

Ask which machine class holds the tolerance and whether the shop has measured capability data on similar parts.

What does no minimum order quantity actually mean?

It means the shop will run a single prototype without a tooling deposit or a minimum buy. Setup cost is still there, so the per-piece price at quantity one is high.

The value is in the workflow: the same fixture design and inspection plan carry into the production run, so the prototype and the 10,000-piece lot come off the same process.

Which certification do I need for automotive parts?

IATF 16949:2016 is the automotive quality standard and is usually required by OEMs and Tier 1 suppliers. ISO 9001:2015 alone is not enough for a production automotive part.

Ask for the certificate scope to confirm it covers the process and the plant that will run your job.

How do I protect my design when sending files overseas?

Sign an NDA before releasing production models. For sensitive programs, look for a supplier holding ISO 27001:2022, which covers information security management.

Ask who inside the factory can open the files, how they are stored, and when they are deleted after the project closes.

What surface finish should I specify?

Start from function. A sealing face or bearing bore may need Ra 0.2-0.8 μm. A general machined surface is fine at Ra 0.8-1.6 μm. A non-critical bracket can run as-machined at Ra 1.6-3.2 μm.

Every step toward a finer finish adds polishing or lapping time. Specify the coarsest finish that meets the function.

Send the model and get a DFM read in 12 hours

Upload your 3D file and drawing. We return a quotation with manufacturability notes, a machine recommendation and a staged lead time. Prototype quantities are welcome.

12-hour quoteNo MOQ100% inspectionNDA on request

Follow

More from the shop floor

We publish setup notes, tooling trials and inspection data from the factory floor.

FacebookTikTokYouTubeLinkedInInstagramThreadsPinterest

Trusted by engineers and manufacturers worldwide

Tesla Ford Motor Company BYD Auto Denso Magna International Boeing Airbus Medtronic KUKA FANUC