GreatLight CNC Machining Factory logo
CNC Machining
Rapid Prototyping
Materials
Industries
News
About GL

Get Instant Quote

Supplier selection guide

CNC Machining Service Made in China: A Buyer's Checklist

This guide is for engineers and sourcing teams comparing Chinese machine shops. It covers the checks that actually predict whether your parts arrive on size: tolerance capability, spindle availability, inspection method, certification scope, and how the quote is written. Read it before you send an RFQ.

±0.005 mmNo MOQ12-hour quoteISO 9001 / IATF 16949
cnc machining service made in china
Quick answers

Key takeaways

Tolerance is a process claim, not a numberAsk which machine holds ±0.005 mm on your geometry, and on how many parts.
Check the machine list against your partA 4,000 mm gantry and a Ø400 mm rotary table solve different problems.
MOQ tells you how the shop is organizedNo minimum order quantity means quoting one unit is normal, not a favor.
Certificates have a scope, not just a logoISO 9001, IATF 16949, ISO 13485 and ISO 27001 cover different things.
The quote reveals the shop's habitsVague quotes usually mean vague process control and vague delivery dates.
Judgment table

What to verify before you place an order

Use this as a screening sheet. Each row is a claim a supplier will make; the right column is what proves it.

CheckWhat to askWhat a good answer looks like
ToleranceWhich machine and fixture hold the tightest callout?Names a machine, a workholding method, and a sample inspection report.
Part sizeWhat is your largest travel and rotary table?4,000 × 400 × 150 mm travel and Ø400 mm rotary table, stated plainly.
Axis countHow many simultaneous 5-axis centers do you run?16 five-axis centers; 12 four-axis mills; 27 three-axis machines.
InspectionDo you inspect 100% or sample?100% inspection before shipment, with reports on request.
CertificationsWhich standards, and what is the scope?ISO 9001:2015, IATF 16949:2016, ISO 13485:2016, ISO 27001:2022.
Lead timeQuote turnaround and first-article date?Quote and DFM within 12 hours; production can start within 24 hours.
MOQCan you run one piece, then 10,000?No minimum order quantity, from one prototype to 10,000+ part runs.
ConfidentialityWill you sign an NDA before files move?NDA available on request; uploads kept secure and confidential.

The short version

Pick the shop that can name the machine, show the inspection record, and explain what it cannot hold. Price alone will not tell you which supplier that is.

Tolerance and geometry

Match the tolerance claim to the machine that will cut your part

Almost every Chinese machine shop advertises tight tolerance. The useful question is different: which machine, which fixture, and which inspection method will hold that tolerance on your specific geometry. A ±0.005 mm callout on a 30 mm aluminum bracket is routine. The same callout on a 900 mm thin-wall housing is a fixturing problem, and fixturing is where quotes quietly get rewritten after the first article.

Ask for the machine assignment before you ask for the price. On a part with angled holes and undercuts, a simultaneous 5-axis center removes the part in one setup and keeps the datums consistent. On a simple prismatic plate, a 3-axis machine with a good vise is faster and cheaper. If the shop cannot tell you which one it will use, it has not read your drawing yet.

Geometry also sets the practical floor on surface finish. As-machined surfaces land around Ra 1.6–3.2 μm. A high-quality machined finish runs Ra 0.8–1.6 μm. Fine finishes at Ra 0.2–0.8 μm usually need a separate operation, a different tool path, or hand polishing. Budget for that step instead of arguing about it after the parts ship.

One more thing. Tolerance is a distribution, not a promise about every single part. A shop that tracks its qualification rate can tell you what fraction of a run lands in tolerance. A shop that cannot is guessing. Ask for the number.

  • 1
    Simultaneous 5-axisBest for angled features, deep pockets, and parts that need one datum throughout.
  • 2
    4-axis and mill-turnGood for cylindrical parts with cross-features; fewer setups than turning plus milling.
  • 3
    3-axisFastest and cheapest for flat, prismatic work with features on one or two faces.
Capacity

Read the machine list like a capacity map

A machine count tells you the shop's ceiling. GreatLight runs 127 high-precision CNC machines across 3 wholly-owned plants, with a 7,600 m² main facility in Dongguan and a second site in Singapore. The mix matters more than the total. There are 16 simultaneous 5-axis machining centers, 12 four-axis mills, 27 three-axis machines, and 16 mill-turn centers.

Size ranges are just as important as axis counts. The largest travel is 4,000 × 400 × 150 mm for long parts. Medium work fits 750 × 1,150 × 550 mm or 600 × 600 × 600 mm envelopes. Compact work runs on 500 × 500 × 450 mm and 500 × 310 × 200 mm machines. If your part is 1,200 mm long and needs a rotary table, only part of that list applies.

This is where a lot of sourcing goes wrong. Buyers send a large frame to a shop that only runs small VMCs, or a turned housing to a shop without mill-turn capacity. The quote comes back low, and then the process plan changes. Ask for the specific machine before you compare prices.

Material also narrows the list. Machining 7075 aluminum is routine. Running Inconel or Ti-6Al-4V (TC4) needs rigid setups, slower feeds, and more tool changes, which shows up in the price and the schedule. A shop that lists titanium and Inconel in its standard material set has already solved the tool-life problem.

Quality system

Certifications mean different things, and the scope decides which

Certificates are not interchangeable. ISO 9001:2015 is a quality management baseline. IATF 16949:2016 is written for automotive production and adds traceability and change-control requirements. ISO 13485:2016 is the medical device standard and pushes harder on process validation and documentation. ISO 27001:2022 covers information security, which matters when your CAD files and drawings leave your network.

For most buyers, two of those are doing real work. IATF 16949 tells you the shop can handle PPAP-style documentation and lot traceability. ISO 27001 tells you there is a controlled process for handling customer data. If your parts are medical, ISO 13485 is the one that matters. If you are making brackets for a consumer product, ISO 9001 plus a clear inspection routine is usually enough.

Ask what the certificate covers. A certificate for a trading office says nothing about the shop floor. A certificate that lists the machining site and the processes in scope is the useful document. Request the current certificate and the audit scope statement, not a scanned logo.

Inspection closes the loop. GreatLight inspects 100% of parts before shipment and runs raw material checks, in-process monitoring, and final inspection, with reports available on request. A 99.99% qualification rate is only meaningful if the inspection method matches your drawing callouts. Ask which instrument measures your tightest feature, and whether it is calibrated.

Commercials

Lead time, MOQ, and how the quote is written

Quote speed is a proxy for shop responsiveness. GreatLight returns a quotation and free DFM analysis within 12 hours, and production can start within 24 hours once the order is released. Parts typically ship in 3–5 days. Historical late-delivery probability sits below 2%, which is a useful number because it is stated as a rate, not a promise.

MOQ tells you how the shop is organized. No minimum order quantity means quoting one prototype is a normal transaction, not a favor that delays the real work. It also means the same process plan and the same inspection routine carry over from the prototype to a 10,000+ part run. That continuity is what keeps the second order from failing.

Read the quote for what is missing. A good quote lists the material grade and temper, the stock size, the machine, the finishing steps, the inspection method, and the lead time for each line. A two-line quote that says "CNC machining, aluminum, 10 days" is not a price. It is an opening position.

Confidentiality needs to be settled before files move. Uploads should be handled as secure and confidential, and an NDA should be available on request. If a supplier hesitates on a mutual NDA for a simple prototype, that tells you something about how they will handle your production drawings later.

Traps

Five traps that cost time and money

The first trap is the precision black hole. A supplier claims extreme precision, then fails in mass production because the equipment is worn, the process is not locked, or there is no in-process check. The fix is simple: ask for the machine, the fixture, and the inspection record for a comparable part.

The second trap is comparing quotes with different scopes. One shop includes anodizing and laser marking, another prices bare machined parts. The lower number is not cheaper; it is a different deliverable. Normalize the scope before you compare.

The third trap is ignoring finishing lead time. Anodizing, plating, powder coating, and polishing are often outsourced and add days that never appear in the machining quote. Laser marking has its own constraint: minimum character height 1.5 mm. If your part number has to be readable, design for that.

The fourth trap is treating the prototype and the production run as separate projects. They should share a process plan. The fifth is weak after-sales support. A shop that will not commit to reworking a nonconforming part has not finished the job. Ask what happens when a part fails inspection, and get the answer before the PO, not after.

Workflow

Step by step: screening a supplier in one week

Run these in order. Each step is designed to eliminate a supplier before you spend engineering time on them.

  • 1
    Send the 3D model and 2D drawingInclude material grade, tolerance callouts, surface finish, and quantity. Note any critical features explicitly rather than relying on the title block.
  • 2
    Require a DFM response with the quoteLook for wall-thickness warnings, tool-access notes, and tolerance feedback. A quote without DFM comments means nobody reviewed the part.
  • 3
    Verify the machine assignmentConfirm which machine will run the part, and check its travel against your envelope. Flag any feature that needs 5-axis or mill-turn.
  • 4
    Request an inspection planAsk which instruments measure the tightest callout, how often checks happen, and whether the report is included or billed separately.
  • 5
    Confirm certifications and scopeGet the current certificates for the machining site. Match IATF 16949 or ISO 13485 to your industry, and ISO 27001 to your data risk.
  • 6
    Settle NDA and data handlingSign the NDA before releasing production drawings. Confirm how files are stored and who can access them.
  • 7
    Run a first article before the full runInspect the first article against the drawing, then release the batch. This is cheaper than sorting a full run.
  • 8
    Lock the process for repeat ordersKeep the same material source, machine, and finishing vendor. Changes here are the most common cause of drift between orders.
FAQs

Frequently asked questions

What tolerance can a CNC machining service made in China hold?

GreatLight machines to ±0.005 mm (±0.0002 in) on qualified features. That is a process capability, not a blanket guarantee for every dimension on every drawing.

Features far from the datums, thin walls, and deep pockets will be looser. Send the drawing and the shop should tell you which callouts are achievable and which need a process change.

Is there a minimum order quantity?

No minimum order quantity. Runs range from a single prototype to 10,000+ parts.

The same process plan and inspection routine carry from prototype to production, which is why the first article is worth inspecting carefully.

How fast can parts ship?

Quotation and free DFM analysis come back within 12 hours. Production can start within 24 hours of release, and parts typically ship in 3–5 days.

Finishing steps such as anodizing, plating, or powder coating add time and are usually the reason a schedule slips. Ask for the finishing lead time separately.

Which certifications should I check?

GreatLight holds ISO 9001:2015, IATF 16949:2016, ISO 13485:2016, and ISO 27001:2022.

Match the standard to your industry: IATF 16949 for automotive, ISO 13485 for medical devices, ISO 27001 where customer data handling matters. Ask for the scope, not just the certificate number.

What materials and finishes are available?

Aluminum grades include 6061, 6061-T6, 2024, 5052, 5083, 6063, 6082, 7075, and ADC12. Stainless covers 303, 304, 316, 316L, 420, 430, 431, 440C, and 17-4PH. Steels, copper alloys, titanium (TA1, TA2, TC4), Inconel, magnesium, and engineering plastics such as POM, PEEK, and PC are also standard.

Finishing includes anodizing, electroless nickel, zinc, silver and gold plating, powder coating, black oxide, bead blasting, polishing, and laser marking with a minimum character height of 1.5 mm.

How are my drawings protected?

Uploads are handled as secure and confidential, and an NDA is available on request. Sign it before releasing production files.

The ISO 27001:2022 certification covers the information security process around customer data.

Send your drawing and get a real process answer

Upload your model and drawing. You get a quote and DFM analysis within 12 hours, with the machine, finishing steps, and inspection method spelled out.

12-hour quoteNo MOQ±0.005 mm100% inspection

Follow

More from GreatLight

We publish setup notes, tooling trials and inspection data from the factory floor.

FacebookTikTokYouTubeLinkedInInstagramThreadsPinterest

Trusted by engineers and manufacturers worldwide

Tesla Ford Motor Company BYD Auto Denso Magna International Boeing Airbus Medtronic KUKA FANUC