GreatLight CNC Machining Factory logo
CNC Machining
Rapid Prototyping
Materials
Industries
News
About GL

Get Instant Quote

Buyer guide

CNC Machining Service for Custom Parts: 7 Checks Before You Order

A practical way to compare suppliers when you buy machined custom parts. We cover tolerance, lead time, MOQ, certifications, materials and how a quote is built, so you can judge whether a shop fits your part before you send money.

±0.005 mm tolerance16 five-axis centersNo MOQISO 9001 / IATF 16949
Custom auto spare parts made by a CNC machining service for custom parts
Quick answer

Key takeaways

Start with the geometry, not the priceA part with one setup and three tools is a different buy than a part with five setups. Match the machine to the feature.
Tolerance below ±0.010 mm needs a planAsk which machine holds it, how it is measured, and what the inspection report shows.
MOQ is the wrong first questionFrom one prototype to 10,000+ parts, setup cost matters more than unit price at low volume.
Certifications point to a process systemISO 9001 covers general quality. IATF 16949, ISO 13485 and ISO 27001 speak to automotive, medical and data handling.
A quote should tell you whyMaterial, machine time, finishing and inspection should be visible, not bundled into one number.
Selection table

What to compare between two CNC suppliers

Use these rows to score each shop. A weak cell is not automatically a rejection, but it tells you what to negotiate.

CriterionWhat good looks likeQuestion to ask
Tolerance±0.005 mm on critical featuresWhich machine holds it, and how is it measured?
Lead timeQuote in 12 hours, parts in 3–5 daysDoes that clock start at PO or at drawing release?
MOQNo minimum, one prototype upwardIs setup charged once or per revision?
CertificationsISO 9001:2015, plus industry-specificCan you send the current certificate scope?
MaterialsAluminium, stainless, steel, titanium, plasticsDo you stock the grade, or order per job?
FinishingAnodizing, plating, powder coat, blastingIs finishing in-house or subcontracted?
Inspection100% before shipment, reports on requestWhat does the report list, and who signs it?
QuotingItemized material, machine time, finishWhat changes the price after I approve?
Check 1

Match the part to the machine before you compare price

Price comparison only works when both shops are quoting the same process. A bracket with drilled holes and a flat face is a three-axis job. A hydraulic manifold with ports on five faces is not. If one supplier quotes the simple machine for a complex part, the number looks good until the first article fails.

Start by counting setups. Every time the part must be flipped and re-datumed, you add fixture time and stack tolerance. A five-axis center can reach five faces in one setup, which removes that stack on a part like an engine cover or a surgical housing. On a simple plate, five-axis buys you nothing except a higher hourly rate.

Size decides too. GreatLight runs a 4,000 mm maximum processing size for long parts, plus 750 × 1,150 × 550 mm and 600 × 600 × 600 mm travels, and compact 500 × 500 × 450 mm and 500 × 310 × 200 mm machines for small work. Put your part envelope next to that list before you ask for a price.

A useful test: send the drawing and ask which machine they plan to run. A shop that answers in one sentence knows the part. A shop that answers with a price and nothing else is guessing.

  • 1
    One setup, few toolsThree-axis is fine and cheaper.
  • 2
    Five faces, tight positionFive-axis removes re-datuming error.
  • 3
    Long and slenderCheck travel and workholding before tolerance.
  • 4
    Thin wallsAsk about tool runout and step-down, not just the machine.
Check 2

Read the tolerance and finish numbers as a pair

A drawing that says ±0.005 mm on every dimension is usually a drawing that has not been thought through. Tolerance belongs on the features that function: a bearing bore, a dowel hole, a sealing face. The rest can sit at ±0.1 mm and cost far less to produce.

Surface finish moves with tolerance. A sealing face at Ra 0.8–1.6 μm is a normal machined finish. Ra 0.2–0.8 μm needs a finer pass, a sharper tool and often a different insert, which adds time. As-machined at Ra 1.6–3.2 μm is the baseline for non-critical surfaces.

Ask how the shop measures. A tolerance of ±0.005 mm on a bore needs a bore gauge or a CMM, not calipers. If the inspection method does not match the tolerance callout, the number on the drawing is decoration.

One more thing: datum choice. If the drawing calls a face as datum A but the shop holds the part on that same face, you get a conflict. Send the datum scheme with the model, or expect a DFM note back.

  • 1
    Tolerance where it functionsLoose everywhere else cuts cost fast.
  • 2
    Finish follows toleranceFine finish on a rough part wastes money.
  • 3
    Measurement must match±0.005 mm needs a gauge, not calipers.
Check 3

Lead time: separate quoting from production

Lead time claims get vague. Break them into stages. GreatLight returns a quotation and a free DFM analysis within 12 hours. Production can start within 24 hours after that. Parts ship in 3–5 days for typical runs. The historical late-delivery probability sits below 2%.

The stage that slips most often is material. A shop that stocks 6061-T6 and 304 stainless will start tomorrow. A shop that orders 17-4PH or Ti-6Al-4V per job adds a purchase lead time that never appears in the quote. Ask whether the grade is on the shelf.

Second stage to pin down: finishing. Anodizing, electroless nickel and powder coating take days, and outsourcing adds transport. If the finish is on the critical path, ask if it is done in-house.

Third stage: inspection. A 100% inspection before shipment adds time, but it is the reason the late-delivery number stays low. Do not let a supplier skip it to win a date.

  • 1
    Quote in 12 hoursIncludes free DFM analysis.
  • 2
    Production start in 24 hoursCounted from approved drawing and PO.
  • 3
    Ship in 3–5 daysTypical runs, not every geometry.
  • 4
    Finishing is the hidden stageIn-house or subcontracted changes the date.
Check 4

MOQ, certifications and confidentiality

There is no minimum order quantity at GreatLight. You can order one prototype or a 10,000+ part run. That matters because the first unit is where the geometry gets proven. A shop that only wants volume will quote the prototype high to push you away.

Certifications are not stickers. ISO 9001:2015 covers the general quality system. IATF 16949:2016 applies to automotive work and adds traceability and change control. ISO 13485:2016 applies to medical devices. ISO 27001:2022 covers information security, which matters when your drawings are the product.

Ask for the certificate scope, not the logo. A scope that excludes machining, or a certificate that expired last year, tells you the system is not maintained.

Confidentiality is a separate track. If your part is unreleased, sign an NDA before you upload the model. Uploads are secure and confidential, and a non-disclosure agreement is available on request. Do not send a full assembly to a shop that has not agreed in writing.

  • 1
    No MOQOne prototype to 10,000+ parts.
  • 2
    Match the certificate to the industryIATF for automotive, ISO 13485 for medical.
  • 3
    Check scope and datesA logo is not a system.
  • 4
    NDA before uploadEspecially for unreleased geometry.
Check 5

Material and finishing choices that change the quote

Material choice drives both price and risk. Aluminium 6061-T6 machines fast and holds tolerance. 7075 is stronger and cuts slower. Stainless 303 is free-machining, while 316L resists corrosion but work-hardens. Titanium TC4 (Ti-6Al-4V) needs lower cutting speeds and more tool changes. Inconel is slower again.

Plastics behave differently. POM and ABS machine cleanly. PEEK holds dimension at high temperature but costs more per kilogram than most metals. Carbon fibre is abrasive and dulls tooling fast.

Finishing adds cost in proportion to masking. Anodizing in clear or colour is common. Hardcoat anodizing builds a thicker oxide layer and changes the dimension by a few micrometres per surface, so a tight bore must be masked or cut undersize before coating.

Ask what the finish does to the dimension. A shop that treats finishing as a cosmetic step will miss the bore. Laser marking needs a minimum character height of 1.5 mm, so plan part marking early rather than after the first batch.

  • 1
    Aluminium is the default6061-T6 for most brackets and housings.
  • 2
    Titanium and Inconel are slowExpect more machine time, not just material cost.
  • 3
    Hardcoat moves dimensionsMask tight bores or cut undersize.
  • 4
    Plan laser markingMinimum character height 1.5 mm.
Check 6

What a usable quote looks like

A single number is not a quote. You want to see material, machine time, finishing, inspection and any tooling or fixture cost as separate lines. That way, when you change one feature, you can predict the cost move.

Ask what is not included. Deburring, cleaning, packaging and freight are common omissions. So is the second setup for a feature that needs a re-datum.

Check the revision reference. A quote tied to drawing revision C should not be used to release revision D parts. If the shop does not print the revision on the quote, ask for it.

Finally, ask what would make them come back to you. A shop that flags a thin wall, an impossible corner radius or a tolerance stack during quoting is doing the DFM work you are paying for. The free DFM analysis at quoting time is where money is saved.

  • 1
    Itemized linesMaterial, machine time, finish, inspection.
  • 2
    List the exclusionsDeburr, clean, pack, freight.
  • 3
    Revision on the quoteRelease only against that revision.
Process

Step by step: how to place a custom parts order

Follow these steps to keep the first article close to the drawing.

  • 1
    Send the 3D model and 2D drawing togetherSTEP or IGES plus a PDF with datums, tolerance and finish callouts. A model alone leaves critical features to guesswork.
  • 2
    State the function of each tight featureSay which bore is a bearing seat and which hole is clearance. This lets the shop loosen the rest and cut cost.
  • 3
    Ask for DFM feedback before the priceA free DFM analysis takes hours, not days. Fix thin walls under 1.0 mm and internal corners smaller than the tool radius at this stage.
  • 4
    Confirm the machine and the datum schemeAsk which machine holds the part and where the datum is picked up. Re-datuming between operations is the most common source of position error.
  • 5
    Agree on the inspection method±0.005 mm features need a bore gauge or CMM. Decide what the report lists and who signs it before the run starts.
  • 6
    Lock the drawing revisionThe purchase order should reference the same revision as the quote. A silent revision change restarts setup and inspection.
  • 7
    Confirm finishing and maskingSend a masking list for anodizing or plating. Masked bores, threads and sealing faces must be marked on the drawing, not described in an email.
  • 8
    Review the first article before the full runCheck the report against the drawing, then release the balance. This is cheapest on a one-off prototype, and it still pays on a 10,000-part run.
FAQs

Frequently asked questions

What is the smallest order you accept?

There is no minimum order quantity. You can order a single prototype or a production run above 10,000 parts. The setup cost is the same either way, so the first unit carries most of the price.

For a prototype, send the model and the drawing. A free DFM analysis comes back with the quote within 12 hours.

Which materials can you machine?

Aluminium grades include 6061, 6061-T6, 2024, 5052, 5083, 6063, 6082, 7075 and ADC12. Stainless covers 303, 304, 316, 316L, 420, 430, 431, 440C and 17-4PH.

Steel grades include 1018, 1045, 4130, 4140, 4340, A36 and tool steel. Titanium TA1, TA2 and TC4, Inconel and magnesium AZ31B or AZ91D are available, along with copper and brass C101 to C36000 and plastics such as ABS, PC, POM, PEEK and PA.

How do you hold ±0.005 mm?

The tolerance is held on features that need it, using the right machine and a stable setup. Re-datuming is minimized by running five-axis work in one setup where the geometry allows.

Measurement matters as much as the cut. Features at ±0.005 mm are checked with a bore gauge or CMM rather than calipers, and 100% inspection happens before shipment.

Can you sign an NDA before I send drawings?

Yes. A non-disclosure agreement is available on request, and uploads are secure and confidential. For unreleased geometry, sign first and send the model after.

ISO 27001:2022 certification covers information security, which is relevant when customer drawings and models are stored and transferred.

How fast can parts ship?

Quotation and free DFM analysis come back within 12 hours. Production can start within 24 hours after that, and parts ship in 3–5 days for typical runs.

Material availability and finishing are the two stages that move the date. Ask whether your grade is stocked and whether finishing is done in-house.

Do you provide inspection reports?

Yes, reports are available on request. Inspection covers raw material check, in-process monitoring and final inspection, with 100% inspection before shipment.

Tell us at quoting time which dimensions must appear on the report. Adding a report after the run means measuring parts that have already been packed.

Send your drawing and get a quote in 12 hours

Upload the model and drawing, and we will return a price with free DFM analysis. No minimum order quantity, and an NDA is available before you send anything.

12-hour quoteNo MOQ100% inspectionNDA on request

Follow

More from GreatLight

We publish setup notes, tooling trials and inspection data from the factory floor.

FacebookTikTokYouTubeLinkedInInstagramThreadsPinterest

Trusted by engineers and manufacturers worldwide

Tesla Ford Motor Company BYD Auto Denso Magna International Boeing Airbus Medtronic KUKA FANUC