15Y
Machining since 2011
Fifteen years of production work across automotive, medical, aerospace, and industrial machinery programs.
±0.005 mm
Tolerance we quote and hold
The same number appears on the quote, the inspection plan, and the final report. No separate promise for the first article.
99.99%
Qualification rate
Parts that pass inspection on the first pass. Driven by in-process monitoring rather than end-of-line sorting.
12H
Quote and DFM
A quotation plus a free DFM analysis lands within 12 hours of your upload, including tooling and fixturing notes.
ISO / IATF
Audited systems
ISO 9001:2015, IATF 16949:2016, ISO 13485:2016, and ISO 27001:2022 cover quality, automotive, medical, and data handling.
150
Technicians on staff
Machinists, inspectors, and project engineers across three wholly-owned plants and 7,600 m² of floor space.
7,600 m²Manufacturing space
3Wholly-owned plants
100%Inspection before shipment
<2%Historical late-delivery rate