GreatLight CNC Machining Factory logo
CNC Machining
Rapid Prototyping
Materials
Industries
News
About GL

Get Instant Quote

Buyer guide

Open CNC Machining Factory: 7 Proven Checks Before You Send an RFQ

An open CNC machining factory takes your files, quotes them, and machines the parts without hiding the process behind a sales layer. This guide is for design engineers and sourcing staff who need to compare shops on real numbers. Read it and you can judge whether a supplier fits your part, your tolerance, and your schedule.

DFM within 12 hours±0.005 mm toleranceNo minimum order quantityISO 9001 / IATF 16949
Open CNC machining factory service guide for engineer RFQ checks
Quick answers

Key takeaways

Tolerance is a machine question±0.005 mm needs the right spindle, thermal control, and a probe check. Ask which machine holds it.
MOQ tells you who they serveA shop with no minimum order quantity can run one prototype and a 10,000-part release on the same line.
Certificates are scope-limitedISO 9001 covers process control. IATF 16949 and ISO 13485 only matter if your industry needs them.
Quote speed predicts nothingA 12-hour quote with a real DFM note beats a 2-hour price with no comments on your drawing.
Inspection reports are not free by defaultAsk up front which reports ship with the parts, and which cost extra.
Selection matrix

What to compare across open CNC machining factory quotes

Use the left column as your RFQ checklist. The right columns show what a capable supplier should be able to state in writing.

CheckWhat to askRed flag
ToleranceWhich machine holds ±0.005 mm on this feature?A blanket tolerance claim with no machine name
Part sizeMax travel and max part envelopeNo answer above 1,000 mm
Axis count5-axis simultaneous or 3+2 only?Calls 3+2 "5-axis" without saying so
MOQOne piece accepted? Price break at what qty?Minimum order in the hundreds for a prototype
Lead timeQuote time, first-cut time, ship timeOne number for all three stages
CertificationsISO 9001, IATF 16949, ISO 13485, ISO 27001Copies requested but never sent
InspectionWhich reports ship free, which are billed?No CMM or first-article option
Material traceabilityMill certs on request?No material lot records

The short verdict

Choose an open CNC machining factory that answers the tolerance question with a machine, the lead-time question with three clocks, and the quality question with a named inspection method. Price alone will not tell you which shop can repeat the job.

Check 1

Tolerance and machine fit at an open CNC machining factory

Tolerance is where most RFQs go wrong. A drawing that says ±0.005 mm on a 300 mm aluminium bracket is not the same job as ±0.005 mm on a 40 mm stainless connector. The first needs thermal stability across the whole travel. The second needs a rigid setup and a probe to verify the datum before cutting.

Ask which machine will run the part, not which machines the shop owns. A 16-machine 5-axis fleet does not help if your job is scheduled on a worn 3-axis mill. At GreatLight, the 4,000 × 400 × 150 mm travel machines cover long parts, while the 500 × 500 × 450 mm and 600 × 600 × 600 mm cells handle tighter work with less thermal drift.

For features that must hold ±0.005 mm, expect in-process probing and a controlled temperature room. If a supplier quotes the tolerance but cannot describe how they verify it, the price is a guess. You will find out at first article.

  • 1
    State tolerance per featureBlanket tolerances hide the hard features and invite disputes.
  • 2
    Ask for the machine listMatch travel and spindle to your part envelope.
  • 3
    Confirm the datum strategyA probe check before cutting saves a rework cycle.
Check 2

Lead time: separate the three clocks

Quotes often blur three different times: how long to quote, how long to first cut, and how long to ship. A shop that quotes in 12 hours with a DFM note is useful. A shop that quotes in 2 hours with no comments on your drawing is not, because you will spend the next week resolving questions that should have been caught on day one.

Ask when the first chips fly. Production can start within 24 hours at GreatLight once the drawing and material are confirmed, and parts ship in 3–5 days for standard jobs. That is a scheduling claim, not a delivery guarantee. Treat any guaranteed date as a red flag unless the shop controls its own material stock.

Historical late-delivery probability is a better number than a promise. At GreatLight it sits below 2%. Ask your supplier for the same figure and how they measure it. If they track on-time shipment by order line, not by customer, the number means something.

  • 1
    Quote clock12 hours with DFM feedback is a working benchmark.
  • 2
    First-cut clock24 hours after drawing and material release.
  • 3
    Ship clock3–5 days for standard jobs, longer for exotic material.
Check 3

Axis count and part geometry

Five-axis simultaneous machining removes setups on parts with undercuts, angled holes, or contoured surfaces. A turbine blade profile or a medical implant with internal channels is a five-axis job. A flat plate with four holes is not. Paying five-axis rates for a three-axis part is the most common overspend in low-volume buying.

The alternative is 3+2, where the table indexes and then the cut happens in three axes. It is cheaper and often accurate enough. Ask the shop to state which one they plan to use and why. If the answer is "five-axis" without a geometry reason, push back.

For mill-turn parts, one machine completes the OD and the face features without re-chucking. That matters when concentricity between a turned bore and a milled slot drives function. GreatLight runs 16 mill-turn centers alongside 16 simultaneous 5-axis machining centers and 27 three-axis machines, so the routing can match the geometry instead of the other way around.

  • 1
    Five-axis simultaneousUndercuts, contoured surfaces, angled features in one setup.
  • 2
    3+2 indexingCheaper, accurate on prismatic parts with angled faces.
  • 3
    Mill-turnConcentricity between turned and milled features.
Check 4

MOQ, prototypes, and the cost of a single part

A no-minimum-order shop is telling you something about how it is set up. If they can quote one piece and 10,000 pieces on the same process, they have the tooling flexibility and the inspection bandwidth to treat a prototype as a real job. That is not universal. Many shops hide setup cost in a minimum order quantity of 100 or more.

For prototypes, ask what changes between the one-off and the production run. If the answer is "nothing, we just run more," be careful. Prototype routing often uses soft jaws and manual checks. Production routing uses fixtures, in-process gauges, and a documented control plan. The tolerance should not change, but the method will.

Cost per part falls fast in the first 50 pieces and slowly after that. If a quote shows a flat per-unit price from 1 to 10,000, the supplier either did not model setup properly or is padding the small quantities. Ask for the setup fee as a separate line.

  • 1
    One piece to 10,000+A shop that quotes both ends is usually set up for both.
  • 2
    Separate setup from unit costYou can see where the money goes and negotiate from facts.
  • 3
    Prototype vs production routingSame tolerance, different fixtures and inspection.
Check 5

Certifications, material, and finishing scope

Certificates matter only when they cover the process you are buying. ISO 9001:2015 is a baseline quality system. IATF 16949:2016 matters for automotive and EV programs, ISO 13485:2016 for medical devices, and ISO 27001:2022 when your drawings and CAD files must stay controlled. Ask for the certificate scope, not just the logo.

Material selection drives both price and lead time. Aluminium 6061, 7075, and 6082 are stocked and fast. Titanium TC4 (Ti-6Al-4V), Inconel, and magnesium AZ31B or AZ91D are machinable but need slower feeds and more tool changes. Stainless 17-4PH (SUS630) sits in the middle. If a supplier quotes titanium at aluminium speed, the quote is wrong.

Finishing is a separate scope with its own lead time. Anodizing, electroless nickel, zinc and black oxide, bead blasting, and laser marking all add days. Laser marking needs a minimum character height of 1.5 mm to stay legible. Put finishing on the RFQ line items so the quote cannot hide it.

  • 1
    Ask for certificate scopeISO 9001 alone does not cover medical or automotive controls.
  • 2
    Flag exotic materialsTitanium, Inconel, and magnesium change feeds and cost.
  • 3
    Quote finishing separatelyAnodize, plating, and marking add lead time.
Check 6

Inspection reports and what ships with the parts

100% inspection before shipment sounds like a strong claim until you ask what is measured. A shop can inspect every part with calipers on two dimensions and still miss the feature that matters. Ask which dimensions get measured, with what instrument, and against which datum. The answer should reference the drawing, not a general procedure.

Raw material check, in-process monitoring, and final inspection are three different gates. Ask which one produces a record you receive. First-article inspection and CMM reports are common requests. Some shops include them, some bill them. Get it in the quote so there is no argument after delivery.

If your part is functional, ask for the qualification rate on comparable work. At GreatLight it is 99.99%. That number is only meaningful when paired with the inspection method. A high rate with a weak method is a marketing figure.

  • 1
    Name the dimensionsInspection is only as good as the feature list.
  • 2
    Ask what ships freeMaterial certs, FAI, and CMM reports are separate items.
  • 3
    Match report to functionA functional part needs functional dimensions checked.
Check 7

Confidentiality and file handling

Your CAD files carry your design intent. An open CNC machining factory should tell you how uploads are stored, who can open them, and how long they stay on the server. "Secure and confidential" is a phrase, not a control. Ask whether access is role-limited and whether files are deleted after the run.

An NDA is a normal request, not an accusation. If a supplier hesitates, that is a data point. A written NDA plus ISO 27001:2022 scope gives you something to point at if a design leaks. For medical and aerospace work, this is usually a customer requirement before any file moves.

Keep the practical side in view. A shop that cannot receive a STEP file and a PDF drawing without email ping-pong will slow your program down. Test the upload path on the first RFQ. If it is clumsy, it will stay clumsy at volume.

  • 1
    Ask how files are storedRole-limited access and deletion after the run.
  • 2
    NDA on requestStandard practice for new designs and medical work.
  • 3
    Test the upload pathClumsy file handling slows every future order.
How to run the RFQ

Step by step: from drawing to purchase order

Follow this sequence to get comparable quotes instead of a pile of prices.

  • 1
    Prepare one drawing per partPDF plus STEP. Mark critical dimensions and datums. Put tolerance per feature, not a blanket note.
  • 2
    State material and finish as separate linesWrite the alloy grade, not just "aluminium." List anodize color, plating type, or marking text.
  • 3
    Set quantities in tiersAsk for 1, 10, 100, and 1,000 pieces. A flat per-unit price across tiers is a warning sign.
  • 4
    Demand a DFM note with the quoteThin walls, deep pockets, and sharp internal corners should be flagged in writing.
  • 5
    Confirm the three clocksQuote time, first-cut time, ship time. Record all three before releasing the PO.
  • 6
    Lock inspection and reportsName the dimensions, the instrument, and which reports ship with the parts.
  • 7
    Sign the NDA before files moveEspecially for medical, aerospace, and unreleased consumer products.
FAQs

Questions sourcing teams ask

What makes a CNC machining factory "open"?

The term usually means the shop quotes and machines from your files without a closed tooling or fixture commitment. You send a STEP file and a drawing, they return a price and a DFM note.

It does not mean the process is documented publicly. Ask for the machine list, the inspection method, and the certificates that apply to your part.

Can an open CNC machining factory hold ±0.005 mm?

Yes, on the right machine and the right feature size. ±0.005 mm (about ±0.0002 in) is achievable on parts that fit the work envelope and are machined in a temperature-controlled area with in-process probing.

The tolerance is harder to hold on thin walls, long parts, and materials with high thermal expansion. State which features need it instead of applying it to the whole drawing.

How fast can I get a quote and first parts?

At GreatLight, quotation and free DFM analysis come back within 12 hours. Production can start within 24 hours once the drawing and material are confirmed, and standard jobs ship in 3–5 days.

Exotic materials and multi-step finishing add time. Ask for a schedule that separates each stage.

Is there a minimum order quantity?

GreatLight has no minimum order quantity. The same process covers one prototype and runs of 10,000+ parts.

Small quantities carry a setup cost. Ask for it as a separate line so you can see what you are paying for.

Which certifications should I check?

ISO 9001:2015 is the baseline. Add IATF 16949:2016 for automotive and EV, ISO 13485:2016 for medical devices, and ISO 27001:2022 when file security is part of the requirement.

Ask for the certificate scope. A certificate that does not cover your process does not help your audit.

How do you protect my design files?

Uploads are kept secure and confidential, and an NDA is available on request. Access to customer files is limited to the people who need them for the job.

If your program requires ISO 27001:2022 scope, say so before the first file transfer so the paperwork is in place.

Send your drawing, get a real answer

Upload a STEP file and a drawing. You get a quote plus DFM feedback within 12 hours, and a named machine for the tolerance you need.

12-hour quote100% inspectionNo minimum order quantityNDA on request

Follow

More from the shop floor

We publish setup notes, tooling trials and inspection data from the factory floor.

FacebookTikTokYouTubeLinkedInInstagramThreadsPinterest

Trusted by engineers and manufacturers worldwide

Tesla Ford Motor Company BYD Auto Denso Magna International Boeing Airbus Medtronic KUKA FANUC