This Swiss CNC manufacturer guide is written for engineers and procurement staff who need to compare machine shops on tolerance, lead time, MOQ and certifications. Read it and you will know which questions separate a real partner from a price quote.

±0.005 mm toleranceNo MOQ12-hour DFM3–5 day shipping
Swiss CNC manufacturer guide for precision machined parts
Key takeaways

What matters before you send an RFQ

Tolerance must match the process±0.005 mm is achievable, but only on the right machine and with the right fixturing.
Certifications are not decorationISO 9001, IATF 16949, ISO 13485 and ISO 27001 cover different risks.
MOQ tells you who they serveA shop with no minimum can run one prototype or 10,000+ parts without retooling.
Quote speed predicts production speedQuotation and free DFM within 12 hours is a useful benchmark.
Inspection data should be on request100% inspection before shipment is the baseline, not a premium add-on.
Decision table

Which shop fits your part

Use this table when you first shortlist suppliers.

SituationWhat to checkRed flag
Tight tolerance, ±0.005 mmMachine type and inspection methodNo CMM report on request
One prototype onlyMinimum order quantitySetup fee that kills the trial
10,000+ part runSpindle hours and fixture planSame lead time promised as a one-off
Medical or automotive partISO 13485 or IATF 16949Certificate expired or out of scope
Complex 5-sided geometrySimultaneous 5-axis count3+2 indexing sold as 5-axis
Confidential design filesNDA and data handlingUploads over plain email only
Large part, 4,000 mmTable travel and gantry setupOversize work subcontracted
Tolerance

Check 1: tolerance claims and how they are measured

Every shop will say it holds tight tolerance. The useful question is how the number was measured. A ±0.005 mm claim on a 4,000 mm part is a different job than the same claim on a 20 mm stainless pin. Ask which machine runs the feature, how the part is held, and what inspection step confirms it.

On our floor, that number comes from 16 simultaneous 5-axis machining centers, 12 four-axis mills and 27 three-axis machines, plus 16 mill-turn centers. The part geometry decides the machine. A long shaft with cross-holes belongs on a mill-turn center, not on a three-axis mill with three re-fixturings.

Surface finish follows the same logic. Ra 0.2–0.8 μm is a fine finish that usually needs a separate operation. Ra 0.8–1.6 μm is a normal high-quality machined surface. Ra 1.6–3.2 μm is as-machined and often fine for brackets or covers. If a quote lists one finish for every face, the quote is not finished yet.

  • 1
    Ask for the measurement methodCMM, optical or hand tools give different confidence levels.
  • 2
    Match finish to functionSealing faces need Ra 0.8 μm or better; clearance holes rarely do.
  • 3
    Check the datum planA tolerance without a datum reference is not a specification.
Lead time

Check 2: lead time from quote to shipped parts

Lead time is not one number. It breaks into quoting, DFM feedback, material purchase, machining and inspection. A shop that quotes in a week will usually start production in a week. Ask for each stage separately and the answer becomes useful.

Our published figures are: quotation and free DFM analysis within 12 hours, production can start within 24 hours, and parts ship in 3–5 days. Historical late-delivery probability is below 2%. Those numbers assume the drawing is complete and the material is standard.

Material is the usual hidden delay. 6061, 303 and 304 stainless are normally in stock. Inconel, titanium TC4 and beryllium copper often are not. If your part uses one of those, say so in the RFQ and expect the material stage to dominate.

Oversize parts add another layer. A 4,000 mm workpiece needs the right travel and a fixture plan before anyone cuts metal. Confirm both before you commit to a date.

  • 1
    Split the timelineQuote, DFM, material, machining, inspection.
  • 2
    Flag exotic material earlyInconel and titanium drive the schedule.
Certifications

Check 3: certifications and the risk each one covers

Certificates are easy to list and easy to misread. Each one covers a different risk. ISO 9001:2015 covers the quality management system. IATF 16949:2016 covers automotive production and the traceability that goes with it. ISO 13485:2016 covers medical device manufacturing. ISO 27001:2022 covers information security.

If your part goes into a car, IATF matters. If it goes into a surgical instrument, ISO 13485 matters. If your drawings are the valuable part of the job, ISO 27001 matters because it governs how files are stored and who can open them.

Ask to see the current certificate and the scope. A valid certificate for the wrong scope does not help you. This check takes ten minutes and prevents most supplier surprises later.

  • 1
    ISO 9001:2015Baseline quality system for general machining.
  • 2
    IATF 16949:2016Automotive programs and traceability.
  • 3
    ISO 13485:2016Medical devices and process validation.
  • 4
    ISO 27001:2022Design file confidentiality and access control.
MOQ and quoting

Check 4: MOQ, quotingscope and what the price includes

A minimum order quantity tells you which customers the shop is built for. A shop with no MOQ can run one prototype and then 10,000+ parts without changing how it quotes. That flexibility matters when a design is still moving.

Ask what the unit price includes. Machining, material, finish, inspection and packaging are often listed separately. A low unit price with finishing and inspection added later is not a low price.

Quotingscope also matters across quantity breaks. Ask for a 1-piece price and a 100-piece price from the same supplier. The ratio tells you how much of the cost is setup and how much is cycle time. If the ratio barely moves, the shop is pricing cycle time into every part.

For prototypes, a free DFM pass is worth more than a small discount. It catches thin walls, deep pockets and tolerances that cannot be reached before the machine starts.

  • 1
    No MOQOne prototype to 10,000+ part runs.
  • 2
    Ask for two quantity breaksThe ratio reveals setup versus cycle time.
  • 3
    Confirm what finishing costsAnodizing and plating are separate operations.
Beyond the machine list

Check 5: what a machine list does not tell you

A machine list is a starting point, not a capability. Two shops can own the same 5-axis model and deliver very different parts. The difference is the fixture, the tool path and the person who wrote it.

Look at the support functions around the spindle. Material stock, in-house finishing, inspection equipment and a sample room all shorten the path from drawing to part. We keep a sample center where you can review prior work before committing to a program.

We run 127 high-precision CNC machines across 3 wholly-owned plants covering 7,600 m², with 150 technicians. That scale is useful for overflow and for keeping a program moving when one plant is loaded.

The last check is communication. A supplier who answers a technical question with a specific number is easier to work with than one who answers with an adjective.

  • 1
    In-house finishingAnodizing, plating, powder coating, black oxide.
  • 2
    Sample reviewInspect similar parts before production.
  • 3
    Technical answersNumbers, not adjectives.
Process

How to qualify a supplier in 6 steps

Run these in order. Each step produces a document you can compare across suppliers.

  • 1
    Send a complete drawing setInclude 2D drawings with datums, plus 3D STEP files. Missing datums are the most common cause of a slow quote.
  • 2
    Request DFM feedback with the quoteAsk for thin-wall, deep-pocket and tolerance comments. Expect it within 12 hours from a shop set up for prototyping.
  • 3
    Ask for two quantity breaksRequest a 1-piece and a 100-piece price. Compare the ratio, not just the unit number.
  • 4
    Confirm the inspection planAsk which features are measured, with what equipment, and whether a report is included on request.
  • 5
    Check certification scopeMatch ISO 9001, IATF 16949, ISO 13485 or ISO 27001 to the risk in your program.
  • 6
    Sign the NDA before files moveConfidentiality should be agreed before CAD files leave your system, not after.
FAQs

Questions engineers ask before ordering

What tolerance can a Swiss CNC manufacturer actually hold?

On the right machine and fixture, ±0.005 mm (±0.0002 in) is achievable. That figure depends on part size, material and feature access.

Ask which machine will run the feature and how the result is measured. A tolerance claim without a measurement method is not verifiable.

Is there a minimum order quantity for prototypes?

We have no minimum order quantity. One prototype and a 10,000+ part run use the same quoting process.

The cost difference comes from setup and cycle time, not from a fixed minimum charge.

Which certifications should I look for?

ISO 9001:2015 is the baseline. Add IATF 16949:2016 for automotive, ISO 13485:2016 for medical devices, and ISO 27001:2022 when design files are sensitive.

Always check the scope on the certificate, not just the logo.

How fast can parts ship?

Quotation and free DFM analysis within 12 hours. Production can start within 24 hours. Parts ship in 3–5 days.

Exotic materials such as Inconel or titanium TC4 can extend the material stage.

What materials and finishes are available?

Aluminium 6061, 7075 and 2024; stainless 303, 304, 316L and 17-4PH; steel 1045 and 4140; titanium TC4; copper and brass; and plastics including POM, PEEK and PC.

Finishes include anodizing, electroless nickel, zinc and silver plating, powder coating, black oxide, bead blasting and laser marking.

How is design confidentiality handled?

Uploads are secure and confidential, and an NDA is available on request.

ISO 27001:2022 covers how files are stored and who can access them.

Send your drawing and get a real answer

Quotation and free DFM analysis within 12 hours, no minimum order quantity, and 100% inspection before shipment.

12-hour quoteNo MOQ100% inspectionNDA on request

Follow

More from GreatLight

We publish setup notes, tooling trials and inspection data from the factory floor.

FacebookTikTokYouTubeLinkedInInstagramThreadsPinterest

Trusted by engineers and manufacturers worldwide

Tesla Ford Motor Company BYD Auto Denso Magna International Boeing Airbus Medtronic KUKA FANUC