CNC Machining Service Pricelist
This guide explains how a CNC machining service pricelist is actually built: setup, cycle time, material, tolerance, finishing and inspection. It is written for engineers and buyers who need to compare quotes line by line instead of by the bottom number. Read it and you can tell which line items are negotiable and which ones are fixed by the geometry.

In this article
- 1
- 2
- 3
- 4
- 5
- 6
- 7
Key takeaways
What actually drives the price on a CNC machining service pricelist
Same part, same shop, three quoting scenarios.
| Cost driver | Cheaper end | Pricier end |
|---|---|---|
| Setup and programming | One OP, 3-axis, simple fixture | 4–5 OPs, 5-axis, soft jaws |
| Stock removal | Near-net blank, light cuts | Solid block, 70% removed |
| Tolerance | ±0.05 mm on general dims | ±0.005 mm on datum features |
| Surface finish | Ra 1.6–3.2 μm as machined | Ra 0.2–0.8 μm, hand polish |
| Material | 6061-T6 aluminium | 316L or Ti-6Al-4V |
| Quantity | Prototype 1–10 pcs | 10,000+ piece run |
| Inspection | Standard check, report on request | 100% dimensional, CMM reports |
| Lead time | Standard 3–5 day slot | Rush, re-sequenced schedule |
How a quote is broken into line items
A CNC machining service pricelist is not a menu with fixed prices. Every quote is a fresh calculation built from your geometry, your material callout, your tolerance block and your quantity. Two shops can quote the same STEP file and land 40% apart, and both can be honest. The difference usually sits in how they read the drawing, not in how much they want to earn.
Ask any supplier to show the quote broken out. A useful quote lists setup and programming hours, estimated cycle time per part, material cost with a stock size, any fixture or soft-jaw work, finishing cost, and inspection scope. If a quote is one number with no breakdown, you cannot tell whether a high price comes from a hard material or from a shop that simply does not want the job.
The setup line is a fixed cost. It does not shrink when you order five parts instead of one. That is why a single prototype bracket can cost more per piece than a 500-piece run of a more complex part: the program, the workholding and the first-article check get divided by a much larger number.
Cycle time is the variable you can influence. Wall thickness, pocket depth, internal corner radii and the number of setups all change how many minutes the spindle spends on the part. A drawing with R3 internal corners in a deep pocket forces a small tool, light passes and long run time. Open those radii to R6 and the same pocket machines in a fraction of the time.
Material and tolerance sit on top of that. A tight tolerance block on a part that does not need it is the single most common way buyers overpay. Mark only the features that matter. General dimensions can live at ±0.1 mm and cost far less.
Finishing and inspection are quoted last because they happen after machining. Anodizing is priced by batch surface area, plating by rack space, laser marking by setup plus character count. Inspection scales with how many dimensions you want recorded, not with how many parts you order.
- 1Ask for a breakdownSetup, cycle time, material, finishing, inspection as separate lines.
- 2Flag critical featuresTight tolerance only where the function demands it.
- 3Send the real quantity1 pc, 50 pcs and 5,000 pcs are three different quotes.
Tolerance and finish trade-offs that change the price
Every shop works inside a tolerance band. GreatLight machines to ±0.005 mm (±0.0002 in) when a drawing calls for it. That number is not the default for every feature. It is the number used where a bore must fit a bearing or a mating face must seal.
Pushing a whole part to ±0.005 mm means slower feed rates, more in-process checks, temperature-stable finishing passes and sometimes a second operation on a jig borer. On a part with thirty dimensions, only three of them usually need that treatment. The other twenty-seven can hold ±0.1 mm with no extra cost at all.
Surface finish follows a similar rule. As-machined surfaces land around Ra 1.6–3.2 μm. A high-quality finish sits at Ra 0.8–1.6 μm and fine finishing reaches Ra 0.2–0.8 μm. Each step down means a different tool, a different stepover and more time on the machine.
Ask which surfaces touch a mating part, slide against a seal or carry an optical path. Those get the fine finish. Everything else is fine as machined. Anodizing and bead blasting also hide tool marks, so a cosmetic housing rarely needs a polished surface underneath a coating.
One warning: a tight tolerance on a thin wall is not the same problem as a tight tolerance on a solid block. Thin walls deflect under cutting force. If a wall is under 1 mm and the tolerance is ±0.01 mm, expect the shop to add support material, light passes and possibly a stress-relief step. That cost is real and should appear in the quote.
- 1±0.005 mmReserve for fits, bores and sealing faces.
- 2Ra 0.8–1.6 μmTypical high-quality machined finish.
- 3Thin walls under 1 mmExpect extra passes and support material.
Material choice and how it lands on the quote
Aluminium is the cheap end of the range. Grades like 6061, 6061-T6, 6082 and 7075 cut fast, produce clean chips and tolerate high spindle speeds. A shop can remove a lot of stock in a short time, so the cycle time line stays low. 7075 is tougher than 6061 and costs a little more in both stock and tool wear.
Stainless steels slow everything down. Grades 303, 304, 316 and 316L work-harden at the cut, so the tool must stay engaged and feed rates drop. 17-4PH in the hardened condition is slower still and often needs a specific insert grade. The material price per kilogram is higher, and so is the machine time.
Titanium and nickel alloys are the top of the range. Ti-6Al-4V and Inconel generate heat at the cutting edge, wear tools quickly and demand rigid setups and generous coolant. Cycle times can be three to five times those of aluminium on the same geometry. If your design allows an aluminium prototype for fit checks and a titanium final part, split the order that way.
Plastics are their own category. POM, PEEK, ABS and PC machine easily but move with temperature. PEEK is expensive per kilogram and abrasive on tooling. Carbon fibre is abrasive enough to require diamond-coated cutters. All of these appear in the material line of a quote, and the stock size you allow matters as much as the grade.
- 1Aluminium 6061-T6Fast to cut, low cycle time, good for most housings.
- 2Stainless 316LWork-hardens, slower feeds, higher tool cost.
- 3Ti-6Al-4V and InconelHeat at the edge, short tool life, longest cycle time.
Quantity breaks, MOQ and how to read them
There is no minimum order quantity at GreatLight. A single prototype and a 10,000-piece run both go through the same quoting process. That does not mean the per-piece price is flat. It means you are not forced to buy a batch you do not need just to get a quote.
The quantity break curve has a distinct shape. The first few pieces carry the full setup cost. As quantity rises, setup spreads thin and the per-piece price drops fast. Then it flattens: once setup is negligible, material and cycle time set the floor, and doubling the order only shaves a small amount.
That shape tells you where to negotiate. If you are ordering 20 pieces and the quote feels high, ask what changes at 100. If the drop is large, the setup is the problem and a simpler fixture or one fewer operation may help. If the drop is small, the cost is in the material and the cycle time, and only a design change will move it.
Prototypes are a special case. Shops often machine prototypes on 3-axis machines with simple workholding, then switch to 5-axis or mill-turn for production. The prototype price reflects that manual approach. Do not use a one-off prototype price to estimate a 5,000-piece run, and do not assume a production price applies to a single part.
- 1No MOQOne prototype or 10,000+ parts, same quoting path.
- 2Setup spreadFirst pieces carry the program and fixture cost.
- 3Flat tailPast a point, only material and cycle time remain.
How to get a usable price in seven steps
- 1Send a STEP or native CAD fileSTEP AP214 or the native SolidWorks, NX or Creo file. Add a PDF drawing if you have one. A 3D model alone misses datum callouts and finish notes.
- 2Mark critical featuresOn the drawing, box the dimensions that need ±0.005 mm and note the surfaces that need Ra 0.8–1.6 μm or finer. Leave the rest at general tolerance.
- 3State the material and stock preferenceName the grade, for example 6061-T6 or 316L. If a near-net blank is acceptable, say so; it cuts roughing time and price.
- 4Give the real quantity and target dateSend 1 pc for form-fit, 50 for pilot, 5,000 for production as separate lines. This shows the quantity break curve instead of a single point.
- 5List finishing and markingAnodizing type and color, plating, laser marking with minimum 1.5 mm character height. Batch these so they are quoted once.
- 6Ask for a DFM noteRequest free DFM feedback with the quote. At GreatLight this comes back with the quotation within 12 hours. Read it before you accept the number.
- 7Confirm inspection scopeSay which dimensions need recorded data and whether you want material certificates. Standard practice is 100% inspection before shipment, with reports on request.
Frequently asked questions
Why do two shops quote the same part so differently?
They read the drawing differently. One shop may assume a 3-axis setup and simple vise work; another may plan a 5-axis operation with a custom fixture. One may include a CMM report, the other a visual check.
The material stock size also varies. A shop that orders a near-net blank pays more for material and less for machine time. Neither quote is wrong. Ask for the breakdown and compare the same lines.
Does a tighter tolerance always cost more?
Yes, when it is applied to features that do not need it. Tightening a general dimension from ±0.1 mm to ±0.005 mm forces slower feeds, more checks and often a finishing pass.
On a feature that already needs a finishing pass for surface finish, the extra tolerance cost is small. Tolerance and finish are related, not independent.
How does quantity change the per-piece price?
Setup, programming and fixturing are fixed. At 1 piece they dominate the price. At 100 pieces they are a minor share. At 5,000 they almost disappear.
Past the point where setup is negligible, the price is set by material and cycle time. That is why doubling from 5,000 to 10,000 rarely halves the unit price.
What certifications should I check before ordering?
Match the certificate to your industry. ISO 9001:2015 covers general quality systems. IATF 16949:2016 applies to automotive work. ISO 13485:2016 covers medical devices. ISO 27001:2022 covers information security for your files.
GreatLight holds all four. Ask for the current certificate scope, not just the logo on a web page.
Can I reduce cost without changing the design intent?
Often yes. Open internal corner radii to match standard tooling, reduce pocket depth where possible, and avoid features that need a second setup on a different face.
Specify general tolerances on non-critical dimensions, and batch finishing operations so they run once. These changes keep the function and cut cycle time.
How confidential are my files?
Uploads are handled as confidential. GreatLight will sign an NDA on request before you send production data.
If your program requires it, ask for the NDA first, then send the CAD files through the agreed channel.
Get a quote you can actually read
Send a STEP file and a drawing. You get a quotation plus free DFM analysis within 12 hours, with setup, cycle time, material and finishing shown as separate lines.