No status until the ship date
You ask for a progress update and get a promise instead of a number. Two weeks pass before anyone admits the material never arrived. The build moves out by a month and the customer meeting moves with it.
When a supplier stops answering, the schedule slips before anyone notices. We give engineers a fixed feedback loop: DFM inside 12 hours, production start inside 24 hours, machined parts out in 3–5 days.

Each one is lost time, not a feeling.
You ask for a progress update and get a promise instead of a number. Two weeks pass before anyone admits the material never arrived. The build moves out by a month and the customer meeting moves with it.
A drawing goes out on Monday and comes back the following Wednesday with no DFM notes. Tolerance callouts that will not run on a 3-axis machine stay in the file, so the first article fails and the fixture work starts over.
Everything routes through a single shop. When its mill goes down or a heat-treat vendor slips, there is no second path. You are weeks from an alternative and the line is already waiting on the part.
Material certs, inspection reports and finish records show up as scanned pages days later, or not at all. Your quality group cannot close the release, so finished parts sit in receiving instead of on the machine.
Schedule risk drops when data moves ahead of metal.

Send a STEP file and a tolerance callout and you get a price plus a DFM analysis within 12 hours. The review flags thin walls, deep pockets, callouts that need a 5-axis setup, and features that will chatter on a long tool. You find out what the part costs and what it will take to hold before you commit a purchase order.
Twelve hours is a working number, not a marketing one. The quote desk reads the drawing, checks stock for the alloy, and routes it to a process engineer when the geometry is unusual. You get one reply with the price, the setup plan and the questions that matter.

Once the order is released, machining can start within 24 hours. 127 CNC machines sit across three plants, so a job does not wait behind a single spindle. Sixteen simultaneous 5-axis centers cover the tight-tolerance work, sixteen mill-turn centers handle parts that would otherwise need two setups and two fixtures.
Parts ship in 3–5 days for the work that fits our standard routing. That window covers milling, turning, deburring and most finishing. When a part needs plating or anodizing, the finish step gets quoted with its own timing so the ship date reflects the whole chain.
Use this to pick the route before you quote.
| Part type | Recommended route | Why |
|---|---|---|
| Prismatic housing, tight bores | 3-axis + 4-axis mill | Simple setups, easy to inspect |
| Complex organic geometry | Simultaneous 5-axis | One setup, no repositioning error |
| Shaft with cross holes | Mill-turn center | Turning and milling in one setup |
| Long frame up to 4,000 mm | Large-travel 3-axis | 4,000 × 400 × 150 mm envelope |
| Thin-wall prototype, low volume | Rapid prototyping | Fast geometry check before tooling |
One purchase order covers the route from stock to finished part.
Sixteen simultaneous 5-axis centers for contoured surfaces, deep pockets and parts that would need three fixtures otherwise.
Twelve 4-axis mills and twenty-seven 3-axis machines for prismatic work, plates and housings.
Sixteen mill-turn centers handle shafts, bushings and fittings with cross holes and flats.
One-off parts before you cut tooling, so geometry errors surface early.
Enclosures, brackets and cast housings for programs that mix processes.
Anodizing, plating, powder coating, bead blasting and laser marking, quoted as a step in the route.
Numbers we can hold, not ranges we hope for.
| Item | Capability | Notes |
|---|---|---|
| Tolerance | ±0.005 mm (±0.0002 in) | On qualified features |
| Surface finish | Ra 0.2–0.8 μm fine | Ra 1.6–3.2 μm as-machined |
| Maximum part size | 4,000 mm | 4,000 × 400 × 150 mm travel |
| Quality rate | 99.99% | Across shipped production |
| Certifications | ISO 9001, IATF 16949 | ISO 13485, ISO 27001 |
| Confidentiality | NDA on request | Secure uploads |
Capacity, tolerance and paperwork, in that order.
Founded in 2011. Three wholly-owned plants and 150 technicians on staff, so a job does not sit waiting for a person.
Sixteen 5-axis, twelve 4-axis, twenty-seven 3-axis and sixteen mill-turn centers spread across the plants.
Held on qualified features and confirmed with inspection data before the parts ship.
Room for long parts and for jobs that need a separate finishing line.
Price and free DFM analysis, so a decision does not wait on a sales call.
Historical probability across shipped orders. We quote windows we can keep.

Titanium and 7075 brackets where setup count drives cost.

Aluminium housings and fixtures that need IATF 16949 paperwork.

Stainless components with clean finishes and traceable inspection.

Mill-turn parts with cross holes that would need two fixtures otherwise.
The cost is usually schedule, not price. A late material shipment or an unanswered status request moves the build out by weeks, and the downstream assembly absorbs the delay.
Visibility fixes the same problem at low cost. A 12-hour quote with DFM notes and a firm ship window tells you in one day whether the route works.
Quotation and free DFM analysis come back within 12 hours. Send a STEP file or a 2D drawing with tolerance callouts and material.
If the geometry needs a 5-axis or mill-turn setup, the reply says so and shows the alternative route.
Production can start within 24 hours of order release. Standard routing ships parts in 3–5 days.
Finishing steps such as anodizing or plating are quoted with their own timing, so the date covers the whole chain rather than just the cut.
No minimum. We run one prototype and we run 10,000+ part runs on the same process.
For a single part, the setup dominates the price. That is a cost fact, not a policy.
±0.005 mm (±0.0002 in) on qualified features. As-machined finish runs Ra 1.6–3.2 μm; fine finishes reach Ra 0.2–0.8 μm with the right tool path and material.
We confirm the values with inspection data before shipment rather than quoting a best case.
Those go to the 5-axis or mill-turn route so the part stays in one setup. Sixteen simultaneous 5-axis centers and sixteen mill-turn centers are available.
We also flag features that need a special fixture or a longer cycle before you place the order.
Uploads are secure and confidential. An NDA is available on request before you send files.
We hold ISO 27001:2022 for information security, alongside ISO 9001:2015, IATF 16949:2016 and ISO 13485:2016.
Aluminium including 6061, 7075 and ADC12; stainless including 303, 304, 316L and 17-4PH; steels such as 1018, 4140 and 4340; copper and brass; titanium TA1, TA2 and TC4; Inconel and magnesium; and plastics including POM, PEEK and PC.
If a job calls for a material outside that list, tell us and we will say whether we can run it.
One upload returns the price, the DFM notes and a ship window you can plan around.
12-hour quote100% inspectionNo minimum orderNDA on request
Trusted by engineers and manufacturers worldwide
Upload your 3D model or 2D drawing and get a quotation with a free DFM analysis. Maximum processing size 4,000 mm.
CNC Metals 13 grades
CNC Plastics 10 grades
Machines & processes 12 options
Surface & post-processing 10 options
Material: not selected Machine: not selected Post-process: not selected
Fill in this short form and we'll open WhatsApp with your message ready to send. We only use these details to reply to you.
Nothing is sent until you press send inside WhatsApp.