GreatLight CNC Machining Factory logo
CNC Machining
Rapid Prototyping
Materials
Industries
News
About GL

Get Instant Quote

Machinist Resources

Machinist Resources for CNC Machining

A working reference set for engineers who have to release parts. Setup rules, fixture clamps, tolerance budgets, material choices, and the questions worth asking before a drawing goes to the machine.

±0.005 mm tolerance127 CNC machinesISO 9001 / IATF 1694912-hour quoteNo MOQFree DFM analysis
CNC Lathe Technical Specifications Terminology
±0.005 mmAchievable tolerance
127High-precision CNC machines
15 yearsMachining since 2011
99.99%Qualification rate
Where drawings go wrong

Four failures that start on the drawing

Most scrap is decided before the first cut. These are the recurring ones.

01

A tolerance no process can hold

You call out ±0.005 mm on a 300 mm aluminum bracket. The machine can hold it. The part will not, because thermal growth and tool deflection eat the budget on a long unsupported section. One re-cut costs a week.

02

A wall too thin to clamp

A 0.8 mm wall on a 6061 housing looks fine in CAD. In the vise it springs, and the second op distorts the first. You get oval bores and a scrapped batch instead of a prototype.

03

No datum that a machinist can touch

A drawing datumed to a theoretical intersection gives the operator nothing to indicate against. Setup time doubles, and the inspection report cannot prove the part is good. Fix the datum before you fix the tolerance.

04

A quote that hides the hard operations

Low price, then a change order once the shop finds the 5-axis work. Without a DFM pass, the second quote arrives after the schedule is already committed. Ask for the process plan up front.

How we work

The reference side of the shop

What we check, what we clamp, and what we hand back with the parts.

CNC Machining Services Online
Setup and workholding

Fixture clamps decide the tolerance, not the spindle

A 16-station 5-axis cell still cuts a bad part if the blank moves. Before toolpath work, we look at three things: where the clamp contacts, how many times the part is re-fixtured, and whether the operator can reach the datum with a probe. A part that needs four setups will lose accuracy at every handoff.

For thin walls and long shafts we switch to soft jaws, vacuum plates, or a Ø400 mm rotary table so the part rotates instead of being re-clamped. That keeps one datum for the whole cycle and removes the stack-up from re-indicating.

  • 1
    Clamp forceMatch jaw pressure to wall thickness, not to habit.
  • 2
    Setup countThree setups or fewer on most prismatic parts.
  • 3
    Probe accessDatums must be touchable in the fixture.
oplus_262178
Inspection

A part is not done until it is measured

Every job gets a raw material check, in-process monitoring, and a final inspection before it ships. On tight features we record the actual number, not a pass or fail. That record is what you take into your own assembly, and it is what tells us whether a process is drifting before the next batch starts.

If a feature is hard to inspect, it is usually hard to machine. We flag it during DFM and suggest a change: a wider relief groove, a flat instead of a radius, or a dimension that can be reached with a standard gauge instead of a CMM probe.

  • 1
    Raw materialCertificates checked before the first cut.
  • 2
    In-processCpk tracked on repeating features.
  • 3
    Final100 percent inspection before shipment.

Get Instant Quote

Tolerance by process

What to expect from each operation

Typical capability on stable materials. Long or thin parts shift the number.

OperationTypical toleranceBest for
3-axis milling±0.01 mmPrismatic parts, flat faces, open pockets
4-axis milling±0.01 mmMultiple faces, one rotation, fewer setups
5-axis simultaneous±0.005 mmContoured surfaces, impellers, angled holes
CNC turning±0.005 mmShafts, bushings, threaded bodies
Mill-turn±0.005 mmTurned and milled features in one setup
Capabilities

What you can send us

One shop, one quote, from a single prototype to a 10,000 plus run.

01

5 Axis CNC Machining

Sixteen simultaneous 5-axis centers for contoured surfaces, deep cavities, and angled holes that would need three setups on a 3-axis mill.

02

CNC Milling and Turning

Up to 4,000 mm travel for large frames, and mill-turn centers that finish a turned body and its milled features without re-clamping.

03

Rapid Prototyping

One-off parts in 3 to 5 days. Same inspection standard as production, so the prototype and the run are measured the same way.

04

Sheet Metal Fabrication

Brackets, enclosures, and chassis parts where the geometry is flat and the volume is higher than a milled version would justify.

05

Custom 3D Printing

For fit checks and low-stress covers before tooling. Useful when a machined version would be wasted on a shape that is still changing.

06

Surface Finishing

Anodizing, plating, powder coat, bead blasting, and laser marking. We run the finish after the final inspection, not before.

Materials and finishes

The short list

If your grade is not here, ask. The answer is usually still yes.

GroupGradesNotes
Aluminum6061-T6, 7075, 2024, 6082Best all-round machinability
Stainless303, 304, 316L, 17-4PH17-4PH for strength and corrosion
Steel1018, 4140, 4340, A364140 for shafts and tooling bodies
TitaniumTC4 (Ti-6Al-4V), TA2Slow speeds, tight tool control
PlasticsPOM, PEEK, PC, ABSPEEK for high-temperature parts
Why GreatLight

Numbers we are willing to be measured on

Six things a buyer or engineer can check before placing an order.

±0.005 mm

Tolerance we hold

On stable materials and reachable features. We will say so in the DFM note when a callout is not realistic, instead of quoting it and missing it.

127

CNC machines

3-axis, 4-axis, 5-axis, and mill-turn under one roof, so a part that needs several operations does not travel between suppliers.

12 h

Quote turnaround

Quotation and a free DFM analysis within 12 hours of a drawing and a quantity. Production can start within 24 hours after approval.

3–5 days

Shipping window

Typical lead time on standard parts. Historical late-delivery probability is below 2 percent.

No MOQ

One part or 10,000

We run a single prototype on the same equipment as a production batch, so the first article and the run match.

4 certs

ISO 9001, IATF 16949, ISO 13485, ISO 27001

Quality and information security systems audited to the standard your industry asks for. NDA available on request.

7,600 m²Manufacturing space
150Technicians
4,000 mmMaximum part size
99.99%Qualification rate
Industry requirements

What each industry asks for, and what we deliver

CNC Machining Services Comparison 2026 Fictiv vs Xometry vs GreatLight

Aerospace

Thin-wall housings and brackets where weight and stiffness both matter.

  • ±0.005 mm
  • 100% inspection
  • Material certs
cnc machining

Automotive and EV

Motor housings, busbars, and fixtures that repeat across a build cycle.

  • IATF 16949
  • Cpk tracked
  • 3–5 day ship
cnc machining

Medical Devices

Instrument bodies and manifolds with cleanable surfaces and traceable stock.

  • ISO 13485
  • Ra 0.2–0.8 μm
  • Full traceability
6011

Industrial Machinery

Large frames and plates up to 4,000 mm, machined in one setup where possible.

  • 4,000 mm travel
  • 16 5-axis centers
  • No MOQ
FAQs

Questions engineers send before an order

What file formats do you need for a quote?

STEP and IGES for 3D, PDF or DXF for the 2D drawing with tolerances and datums. A drawing matters more than the model. The model shows the shape, the drawing shows what has to be measured.

If you only have a model, send it. We will state the tolerances we plan to hold and ask you to confirm them before cutting.

Can I get a sample before a production run?

Yes. There is no minimum order quantity, so a single prototype is a normal order. Prototypes typically ship in 3 to 5 days after drawing approval.

The prototype is inspected to the same standard as a production lot, so the report you receive is the report you will keep getting.

How do I get a quotation?

Send the drawing, the quantity, the material, and any finish requirement. We return a quotation and a free DFM analysis within 12 hours.

If a feature will drive cost or risk, we say so in that reply, with the alternative. You decide before anything is cut.

What does your QC system actually check?

Three gates: raw material certificates before the first cut, in-process monitoring on repeating features, and a final inspection before shipment. Every part is inspected, not sampled.

Inspection reports are available on request. If you need specific data points recorded, tell us on the drawing and we will log them.

When is 5-axis the right choice, and when is it not?

Use 5-axis when a part has contoured surfaces, angled holes, or features on five faces that would otherwise need three or more setups. The gain is accuracy from fewer handoffs, not just speed.

For a flat bracket with two drilled holes, a 3-axis mill is cheaper and just as accurate. We will quote the simpler process if it meets the drawing.

How do you handle confidentiality?

Uploads are treated as confidential, and we sign an NDA on request before drawings are shared. Our information security management system is certified to ISO 27001:2022.

If your program requires it, tell us at the quote stage so the paperwork is in place before files move.

What tolerances and finishes can you hold?

Tolerance to ±0.005 mm on reachable features in stable materials. Surface finish from Ra 0.2–0.8 μm on fine work, Ra 0.8–1.6 μm on standard machined surfaces, and Ra 1.6–3.2 μm as-machined.

The limit is usually part geometry, not the machine. A long thin wall will move no matter which spindle cuts it, so we flag that in DFM.

Do you work from an existing drawing with tight GD&T?

Yes. Send the drawing as issued, including datum structure and any profile callouts. We review whether each datum can be reached in the fixture before quoting.

If a datum is theoretical or unreachable, we propose a practical one and explain the effect on inspection, so the change is documented rather than assumed.

Send the drawing, get a process plan back

Upload a STEP file and a 2D drawing. We return a quotation and a free DFM analysis within 12 hours, with the operations, tolerances, and risks written out.

12-hour quote100% inspectionNo MOQNDA on request

Trusted by engineers and manufacturers worldwide

Tesla Ford Motor Company BYD Auto Denso Magna International Boeing Airbus Medtronic KUKA FANUC