| Complex 5-axis housing, tight bores | Dongguan | Machine time dominates freight cost |
| Thin-wall aluminium, distortion risk | Dongguan | 16 simultaneous 5-axis centers |
| Large welded steel frame | Local region | Freight exceeds machining value |
| Low-volume prototype, 1–20 pcs | Dongguan | No MOQ, production starts in 24 hours |
| Hardware and standard fasteners | Local region | Catalogue parts, no machining gain |
| 17-4PH or Ti-6Al-4V valve body | Dongguan | Difficult material, rework is expensive |
| Part with a 4,000 mm envelope | Either | We machine up to 4,000 mm, check freight |
| Revision-heavy development part | Dongguan | Setup stays on the machine between revisions |